Press Room

Washington Gas Safety — Mind the Marks

The leading cause of gas damage emergencies in the country are due to individuals and contractors performing excavation work without a Miss Utility ticket. Miss Utility is the organization that coordinates the marking of utility lines to prevent them from being damaged by excavation or demolition work. Excavation includes digging, boring and directional drilling. Homeowners may not be aware that they need to call 811 each and every time they dig. Even if you’re adding a rosebush or mailbox, call before you install!

When it comes to preventing damage to underground utility lines, the area must be marked properly, and those marks must be respected so critical infrastructure is protected. The Call Before You Dig program is an important tool to stop construction crews and excavators from striking lines and disrupting service.

“We ask for the public to help us protect our infrastructure and avoid any disruption in your neighborhoods by calling 811 and telling your neighbors and friends to do the same every time you have a digging project,” said Blue Jenkins, president of Washington Gas.

How is Washington Gas enabling safer digging?

We have developed an Enhanced Positive Response (EPR) program that goes above and beyond locating and marking underground utilities for the customer. It provides the customer-detailed information, including photographs and mapping, specific to their project each time an 811 call is made.

The EPR can be accessed via a hyperlink when you receive your 811 location confirmation email. In addition to the advanced EPR tool, Washington Gas also uses a computer-generated algorithm, as well as a process to rank the risk of each locate and mark request so we can prioritize our efforts, which all help us maintain a leadership role in damage prevention.

The markings consist of paint which is temporary, solvent, biodegradable and is either chalk or water-based. While markings do not indicate exactly where the crews will be digging, it lets the crews know where all utilities are located underground. When excavating, it should be done within two feet on either side of the staked or marked location of an underground utility line.

DO:
• Call 811 at least 48 hours before a planned dig

DON’T
• Assume the depth of a utility line
• Excavate under someone else’s ticket
• Remove an abandoned utility line without receiving proper authorization

Show More

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *


By submitting this form, you are consenting to receive marketing emails from: Washington Informer Newspaper, 3117 Martin Luther King Jr. Ave SE, Washington, DC, 20032, http://www.washingtoninformer.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact

Back to top button

My News Matters to me - Washington Informer Donations

Be a Part of The Washington Informer Legacy

A donation of your choice empowers our journalists to continue the work to better inform, educate and empower you through technology and resources that you use.

Click Here Today to Support Black Press and be a part of the Legacy!

Subscribe today for free and be the first to have news and information delivered directly to your inbox.


By submitting this form, you are consenting to receive marketing emails from: Washington Informer Newspaper, 3117 Martin Luther King Jr. Ave SE, Washington, DC, 20032, http://www.washingtoninformer.com. You can revoke your consent to receive emails at any time by using the SafeUnsubscribe® link, found at the bottom of every email. Emails are serviced by Constant Contact
Close

Adblock Detected

Please consider supporting us by disabling your ad blocker